Rapid Lean Manufacturing Results image

Rapid Lean Manufacturing Results

Improvement over 3 years

20-30% reduction in manufacturing controllable costs
If you are serious about making a real change to your cost base, we can put you in touch with senior managers of businesses who have already made sustainable lean manufacturing results happen.  It’s not all our doing – the credit from results like these over many years, when Lauras were only involved for the first 6 months, really have to go to the teams themselves – but we’re proud to be part of it.

Improvement over 6 months

Predicted versus actual improvement
This factory was starting from a low base (Site measure ~50% / True measure ~35%), and was in some problems.  The predicted thresholds made at the assessment for realising efficiency improvement into bottom line $$$ are shown in green, what was actually achieved is shown in red.
6months-improvement

Already high performing line

This was an already high performing line.  It just goes to show, you can always find something else to improve!

high-performing-line

Specific issue

This was one of our first ever problems – an operator had been working round this waste issue on a daily basis for the previous 15 years.  It took him 6 days to learn PCS, and use it to prove he could effectively eliminate the problem.  It took another 19 shifts to make the solutions permanent – and that problem has now gone forever. This is the important thing about PCS – it’s not Lauras who use it.  We have to be able to – indeed we love problem solving – but we’ve found that operators and engineers consistently arrive at better solutions faster than any external person could.

Results graph - Waste

Non Manufacturing

The Lauras rapid lean tools work on more than just production lines.  Here, post proof of delivery errors was bad, and suddenly getting very bad in the build up to Christmas – a 3x 2-week workshops was all it took to turn this problem around from the worst it had ever been to the best it had ever been in less than 12 weeks – the key being in the mix of people on the workshop who faced the issues daily across departments.

There are many other examples, from many sectors, and different situations.  If you’d like to find out more, just contact us we’re always happy to talk about our results!

Results graph - Non Manufacturing

 

Lauras-SignUp
Get Rapid Lean tips and advice straight to your inbox – sign up here >

 

 

< BACK TO RAPID LEAN

Testimonials

We are pleased with the progress we’re making at the Gweedore site, indeed we’re so pleased that we’re planning to roll out the programme to our other manufacturing sites.

John Donnelly, General Manager, Largo Foods, Ireland

The focussed homework, linking the learning to ongoing behaviour and leadership habits, was particularly useful. Excellent 5* training.

Front Line Manager – FLM Training